Workun Garrick

École Alexandre-Taché

Education Sustainable

This project involved the design and construction of a new two-storey 400 capacity francophone junior senior high school (7-12). The facility includes a permanent core school and 2 modular classrooms with potential for 2 additional modulars to be added in the future for a maximum
build-out capacity of 450 students. Designed to achieve LEED® Gold Certification, the composition and organization of the new school was designed to provide ease of circulation and supervision in an open learning environment while utilizing daylight for natural illumination.